More Sustainability Strings to Our Bow

Our Firestopping skills will be put to work on this great project which consists of 419,093 sq ft of office space and 11,785 sq ft of ground level retail space.

20 Ropemaker Street, a mixed-use commercial scheme, will be using sustainable construction techniques which include efficient use of water and energy, zero waste landfill and materials that mitigate the impact of operations on ecosystems.

This new-build project will include the creation of a double-height entrance and lobby with a separate dedicated cycle entrance. A single storey of business space will be located at mezzanine level in which occupied office space will cover 22 floors with 5 accessible roof terraces. Three basement levels are provided for retail servicing, plant, facilities management, cycle storage and shower facilities.

Client: Skanska
Sector: Mixed Commercial Use
Region: London
Services: Firestopping

The Golden Thread: Building a Safer Future 

Following the Grenfell fire, the Building Safety Act introduced the requirement for a Golden Thread of information for Higher-Risk Buildings (HRBs).

Sentinel Contracting upgrades fire resistance at sustainable redevelopment

Innovative water-based fire protection supports BREEAM Outstanding target at City of London’s Newgate Square.

LATEST NEWS

Following the Grenfell fire, the Building Safety Act introduced the requirement for a Golden Thread of information for Higher-Risk Buildings (HRBs).

Innovative water-based fire protection supports BREEAM Outstanding target at City of London’s Newgate Square.

We put safety, quality, innovation and sustainability first

CASE STUDY