Our Firestopping skills will be put to work on this great project which consists of 419,093 sq ft of office space and 11,785 sq ft of ground level retail space.
20 Ropemaker Street, a mixed-use commercial scheme, will be using sustainable construction techniques which include efficient use of water and energy, zero waste landfill and materials that mitigate the impact of operations on ecosystems.
This new-build project will include the creation of a double-height entrance and lobby with a separate dedicated cycle entrance. A single storey of business space will be located at mezzanine level in which occupied office space will cover 22 floors with 5 accessible roof terraces. Three basement levels are provided for retail servicing, plant, facilities management, cycle storage and shower facilities.
Client: Skanska
Sector: Mixed Commercial Use
Region: London
Services: Firestopping
Fire protection can be installed correctly when a building is constructed and still need attention later in its life. Buildings change. Services are added or replaced, refurbishment work takes place, and new penetrations are made through walls and floors.
For a main contractor, a retail programme rarely slips because the decorating is difficult. It slips because the tenant will not give up trading hours. Every closed hour costs the retailer revenue.
Fire protection can be installed correctly when a building is constructed and still need attention later in its life. Buildings change. Services are added or replaced, refurbishment work takes place, and new penetrations are made through walls and floors.